Project: Point A Hotel Westminster 

Project Duration: 20 Weeks 
Brief Description: install 67 new bathrooms. 
 
 
 
 
ADL Mechanical and Electrical Contractors undertook this refurb project and the existing rooms had bathroom pods which were removed. This was a challenging project with it being in the center of London and the hotel was live during the refurb. 
 
Our scope of works was to install new hot, cold, waste and soil pipework to accommodate new bathroom layouts. We then installed all new sanitary and brass ware to all rooms.